Seattle Premium Outlets
Seattle Premium Outlets Seattle, WA Project Details SAK DivisionTilt Up, Finishing ClientTulalip Tribe Project LocationTulalip, WA Project SQFT300,000 Project Cost$6 MIL Project Duration6 months Project Description The Seattle Premium Outlets is located in Tulalip, WA, right next to the Tulalip Resort Casino, and is a premier destination to shop outside of Seattle. SAK performed the […]
Angel of the Winds
Angel of the Winds Arlington, WA Project Details SAK DivisionCast In Place Structure, Steel Reinforcing ClientStillaguamish Tribe Project LocationArlington, WA Project SQFT175,000 Project Cost$11 MIL Project Duration9 months Project DescriptionThe Angle of the Winds Casino is located in Arlington, WA, and was completed in 9 monnths. SAK performed the cast in place structural concrete and […]
1521 2ND AVE,
1521 2nd Ave Seattle, WA Project Details SAK Division Cast In Place Structure Client Opus Project Location Seattle, WA Project SQFT 475,000 Project Cost $18 MIL Project Duration 18 months Project Description In one and half years, the 1521 2nd Ave condominium tower was built right behind the downtown Seattle waterfront. This 38-story tower has beautiful […]
7th & Madison
7th & Madison Seattle, WA Project Details SAK Division Cast In Place Structure Client Opus Project Location Seattle, WA Project SQFT 400,000 Project Cost $9 MIL Project Duration 9 months Project Description Located in downtown Seattle, WA, this 9-story, mixed-use, midrise was completed in 2009. SAK preformed the cast in place structural concrete for the […]
14301 24TH ST. DISTRIBUTION
14301 24TH ST. DISTRIBUTION Sumner, WA Project Details SAK DivisionTilt-Up, Finishing ClientOpus Project LocationSumner, WA Project SQFT500,000 Project Cost$3 MIL Project Duration4 months Project DescriptionIn Sumner, WA, the 14301 24th St industrial distribution center was completed in 4 months. Along with neighboring facilities, the 14301-distribution center serves the distribution and industrial appetite serving the area. SAK […]
2ND & YESLER
2ND & YESLER Seattle, WA Project Details SAK Division Cast In Place Structure Client Aecon Project Location Seattle, WA Project SQFT 175,000 Project Cost $9 MIL Project Duration 9 months Project Description Located in the historic neighborhood of Seattle: ‘Pioneer Square’, this 13-story, apartment tower was completed in 9 months. SAK performed the cast in […]
AUBURN MEDICAL FACILITY
AUBURN MEDICAL FACILITY Auburn, WA Project Details SAK DivisionCast-In-Place Structure, Tilt-Up, Finishing ClientAuburn MOB Project LocationAuburn, WA Project SQFT81,000 Project Cost$6 MIL Project Duration3 months Project DescriptionIn Auburn, WA, the Auburn Medical Office Building (MOB) was built in 3 months. Though this was a medical office building the type of construction was a tilt-up panel […]
LADD TOWER
LADD TOWER Portland, OR Project Details SAK Division Cast In Place Structure Client Opus Project Location Portland, OR Project SQFT 626,000 Project Cost $28 MIL Project Duration 12 months Project Description In downtown Portland, OR the Ladd Tower mixed-use and condominium project was completed in 12 months. A unique feature of the project was the […]
TECHNICAL GLASS
TECHNICAL GLASS Snoqualmie, WA Project Details SAK DivisionTilt-Up, Finishing ClientOpus Project LocationSnoqualmie, WA Project SQFT75,000 Project Cost$3 MIL Project Duration3 months DescriptionTechnical Glass is an industrial complex built for glass manufacturing. It was built in Snoqualmie, WA, and completed in 3 months. SAK performed the cast in place tilt-up panels for the structure.
The Olivian
THE OLIVIAN Seattle, WA Project Details SAK DivisionCast In Place Structure ClientHanover Project LocationSeattle, WA Project SQFT740,000 Project Cost$22 MIL Project Duration14 months Project DescriptionThe Olivian condominiums is a 26 story tower built in 2009 year in downtown Seattle. It is located just west of the new Washington State Convention Center addition. SAK performed the […]