333 Dexter

Seattle, WA

Project Details

SAK Division
Cast In Place Structure, Steel Reinforcing, Finishing

Client
Kilroy Realty

Project Location
Seattle, WA

Project SQFT
896,000

Project Cost
$40 MIL

Project Duration
18 months

The 333 Dexter project is a twin, 12 story tower, office building located in the high-tech, South Lake Union neighborhood of Seattle. The project was completed in 2019. A unique feature is the exterior ‘Walking’ columns seen at the perimeter of the building. SAK performed the cast in place structural concrete system including: formwork, steel reinforcing, post-tensioning cables, place, and finish. SAK also performed the architectural concrete for project.

architectural concrete